Create a Website Account - Manage notification subscriptions, save form progress and more.
SRTA hired a consultant to assist with the development of public outreach materials and conceptual drawings for many of the ATP Cycle 5 projects. The report on those projects is accessible via the links provided below.
Sustainable Shasta Report
Appendix A: Cottonwood Lasso Loop Plans and Cost Estimate
Appendix B: West Cottonwood School Connector Plans and Cost Estimate
Appendix C: CATTLE Network Plans and Cost Estimate
Appendix D: Ashby-to-Downtown Plans and Cost Estimate
Appendix E: NRATTL Plans and Cost Estimate